What does a Terrazzo Finisher do?

According to people in this career, the main tasks are...

TaskImportance
Measure designated amounts of ingredients for terrazzo or grout, according to standard formulas and specifications, using graduated containers and scales, and load ingredients into portable mixer.
91%
Grind surfaces with a power grinder, or polish surfaces with polishing or surfacing machines.
88%
Cut metal division strips and press them into the terrazzo base for joints or changes of color to form designs or patterns or to help prevent cracks.
88%
Blend marble chip mixtures, place into panels, and push a roller over the surface to embed the chips.
86%
Modify mixing, grouting, grinding, or cleaning procedures, according to type of installation or material used.
86%
Spread, level, or smooth concrete or terrazzo mixtures to form bases or finished surfaces, using rakes, shovels, hand or power trowels, hand or power screeds, or floats.
84%
Wash polished terrazzo surface, using cleaner and water, and apply sealer and curing agent according to manufacturer's specifications, using brush or sprayer.
83%
Grind curved surfaces or areas inaccessible to surfacing machine, such as stairways or cabinet tops, with portable hand grinder.
83%
Position and secure moisture membrane and wire mesh in preparation for pouring base materials for terrazzo installation.
81%
Fill slight grinding depressions with matching grout material and hand-trowel for a smooth, uniform surface.
80%
Sprinkle colored marble or stone chips, powdered steel, or coloring powder over surface to produce prescribed finish.
80%
Clean installation site, mixing and storage areas, tools, machines, and equipment, and store materials and equipment.
80%
Mix cement, sand, and water to produce concrete, grout, or slurry, using hoe, trowel, tamper, scraper, or concrete-mixing machine.
79%
Wet surface to prepare for bonding, fill holes and cracks with grout or slurry, and smooth with a trowel.
79%
Chip, scrape, or grind high spots, ridges, or rough projections to finish concrete, using pneumatic chisel, hand chisel, or other hand tools.
78%
Move terrazzo installation materials, tools, machines, or work devices to work areas, manually or using wheelbarrow.
76%
Mold expansion joints and edges, using edging tools, jointers, or straightedges.
76%
Repair concrete by cutting out damaged areas, drilling holes for reinforcing rods, and positioning reinforcing rods, using power saw and drill.
72%
Clean chipped area, using wire brush, and feel and observe surface to determine if it is rough or uneven.
69%
Precast terrazzo blocks in wooden forms.
65%
Wet concrete surface and rub with stone to smooth surface and obtain specified finish.
64%
Build wooden molds, clamping molds around areas to be repaired, or setting up frames to the proper depth and alignment.
63%
Spread roofing paper on surface of foundation and spread concrete onto roofing paper with trowel to form terrazzo base.
59%
Produce rough concrete surface, using broom.
58%
Remove frames when the foundation is dry.
57%
Signal truck driver to position truck to facilitate pouring concrete and move chute to direct concrete on forms.
55%